Construction equipment is shown set up at Fort McCoy’s South J Street on Sept. 1, 2021, so a bridge can be repaired on the street. The street is closed from Aug. 23 through Oct. 29, 2021, from South 8th Avenue to South 9th Avenue for construction of a new bridge over Tarr Creek. Fort McCoy’s Directorate of Public Works is in charge of construction coordination. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 09.01.2021 |
Date Posted: | 09.03.2021 14:27 |
Photo ID: | 6817471 |
VIRIN: | 210901-A-OK556-182 |
Resolution: | 3636x2700 |
Size: | 1.6 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 11 |
Downloads: | 2 |
This work, Construction of new bridge underway at Fort McCoy [Image 40 of 40], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.