211015-N-GR655-331 GROTON, Conn. (October 15, 2021) – Crewmembers pull a mooring line from the pier to the Historic Ship Nautilus (SSN 571) as the ship prepares to be moored onboard Naval Submarine Base New London in Groton, Conn., Oct. 15. Nautilus, the world’s first nuclear-powered submarine and current Submarine Force Museum centerpiece, will begin an estimated $36 million preservation project and is expected to be completed in six to eight months. (U.S. Navy photo by Chief Petty Officer Joshua Karsten/RELEASED)
Date Taken: | 10.15.2021 |
Date Posted: | 10.15.2021 16:37 |
Photo ID: | 6890443 |
VIRIN: | 211015-N-GR655-331 |
Resolution: | 5568x3712 |
Size: | 11.35 MB |
Location: | GROTON; NEW LONDON, CONNECTICUT, US |
Web Views: | 36 |
Downloads: | 9 |
This work, Historic Ship Nautilus (SSN 571) Gets Underway [Image 12 of 12], by CPO Joshua Karsten, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.