A new multi-million dollar transient troop training barracks is shown Oct. 13, 2021, at Fort McCoy, Wis. Contractor L.S. Black Constructors was awarded a $20.6 million contract to build this barracks in September 2019. The barracks is different than the traditional barracks that are located throughout the installation. This new building is four stories and can house 400 people in approximately 60,000 square feet. The building also is the first of eight new buildings planned for the entire 1600 block of the cantonment area at Fort McCoy. The plan is to build four barracks overall with the same specifications, three 20,000-square-foot brigade headquarters buildings, and one 160-room officer quarters. This barracks project was an Army Corps of Engineers-managed project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 10.13.2021 |
Date Posted: | 10.29.2021 23:10 |
Photo ID: | 6913302 |
VIRIN: | 211013-A-OK556-969 |
Resolution: | 5769x3845 |
Size: | 2.46 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 1 |
Downloads: | 1 |
This work, New barracks building at Fort McCoy [Image 14 of 14], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.