The Air Dominance Center’s new 5th generation capable aircraft hangar construction team continues the framing of the structure in Savannah, Georgia on August 18, 2021. The initial groundbreaking was in February 2021 and the expected completion of the project is in the Winter of 2022. The hangar will be large enough to store a Boeing C-17 Globemaster III aircraft and is being designed after Joint Base Pearl Harbor-Hickam's hangar. (U.S. Air National Guard photo by Tech. Sgt. Caila Arahood)
Date Taken: | 08.18.2021 |
Date Posted: | 11.02.2021 13:06 |
Photo ID: | 6915996 |
VIRIN: | 210818-F-PJ280-924 |
Resolution: | 1927x1305 |
Size: | 483.96 KB |
Location: | GEORGIA, US |
Web Views: | 36 |
Downloads: | 0 |
This work, Air Dominance Center's New Hangar Construction Progress [Image 3 of 3], by MSgt Caila Arahood, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.