A semi-truck transports top soil from west end to east end of runway construction site Oct. 20, 2021 at Offutt Air Force Base, Nebraska. Transporting top soil is part of the cut and fill operation that will lower the elevation in parts of the west and raise it on the east end of the runway. (U.S. Air Force photo by L. Cunningham)
Date Taken: | 10.20.2021 |
Date Posted: | 11.09.2021 08:58 |
Photo ID: | 6925164 |
VIRIN: | 211020-F-LI787-1229 |
Resolution: | 2656x1898 |
Size: | 2.79 MB |
Location: | OFFUTT AIR FORCE BASE, NEBRASKA, US |
Web Views: | 5 |
Downloads: | 1 |
This work, Construction team prepares for winter [Image 5 of 5], by Leticia Cunningham, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.