The D/B THOR heavy lift vessel transits past several response vessels on-station around the Golden Ray wreck site on Thursday. The crane will be used to partially dismantle two sections of the wreck into smaller 200mt to 500mt pieces at a temporary response facility south of Mayors Point Terminal. The smaller pieces will then be transloaded onto container barges and shipped to a recycling facility in Louisiana. St. Simons Sound Incident response photo.