The solo dump truck that was used by the flood response team to stabilize a damaged levee Nov. 11 and 12, 2021, and place rock armor along a 150 linear feet section on the left bank of the Skagit River, Washington, to mitigate against levee failure during the flood. Construction is expected to be completed tonight (Nov. 12). The activity is in response to an atmospheric river and heavy precipitation currently impacting the region. Photo courtesy Seattle District Skagit Flood Team
Date Taken: | 11.12.2021 |
Date Posted: | 11.12.2021 23:36 |
Photo ID: | 6937963 |
VIRIN: | 211112-A-VA654-144 |
Resolution: | 1280x720 |
Size: | 137.57 KB |
Location: | MOUNT VERNON, WASHINGTON, US |
Web Views: | 29 |
Downloads: | 3 |
This work, Army Corps of Engineers amplifies its flood fight assistance across communities [Image 6 of 6], by Nicole Celestine, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.