Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    New bridge at Fort McCoy [Image 34 of 40]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    New bridge at Fort McCoy

    The area of construction operations is shown at a bridge area on South J Street on Nov. 15, 2021, where a new bridge was built on the street at Fort McCoy, Wis. The new bridge was built over Tarr Creek on the installation’s cantonment area. Fort McCoy’s Directorate of Public Works (DPW) was in charge of construction coordination. DPW Construction Inspection Branch Chief Dan Hanson said the project was designed by Short, Elliott, Hendrickson Inc. of La Crosse, Wis., and the construction contract was awarded to RHI LLC — headquartered in West Haven, Utah — on March 30 for $930,107. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 11.15.2021
    Date Posted: 11.16.2021 14:22
    Photo ID: 6941241
    VIRIN: 211115-A-OK556-892
    Resolution: 4968x3248
    Size: 2.64 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 1
    Downloads: 1

    PUBLIC DOMAIN