Kunsan mission partners and members from Honeywell place their hands over their hearts while the National Anthem plays during the installation’s Natural Gas Pipeline Ribbon Cutting Ceremony at Kunsan Air Base, Republic of Korea, Nov. 15, 2021. The natural gas pipeline was installed to provide reliable, sustainable and energy-efficient heating to buildings on the installation. (U.S. Air Force photo by Staff Sgt. Suzie Plotnikov)
Date Taken: | 11.15.2021 |
Date Posted: | 11.22.2021 00:05 |
Photo ID: | 6950047 |
VIRIN: | 211115-F-BZ793-1012 |
Resolution: | 5663x4039 |
Size: | 7.2 MB |
Location: | KR |
Web Views: | 86 |
Downloads: | 3 |
This work, Pipeline ribbon cutting marks Wolf Pack progress, partnerships [Image 7 of 7], by SSgt Suzanna Plotnikov, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.