From October 12 through November 5, 2021, Soldiers of the 3rd Battalion, 27th Field Artillery Regiment, 18th Field Artillery Brigade at Fort Bragg, N.C. receive additional High Mobility Artillery Rocket System launchers and training from the Strategic and Operational Rockets and Missiles Project Office. The event marks the initial fielding to the first newly structured 3x9 battalion and the first HIMARS fielding since 2013. (Photos by 1LT Kendra Thomas, 3-27 FAR, 18th BDE public affairs)
Date Taken: | 11.05.2021 |
Date Posted: | 11.29.2021 12:11 |
Photo ID: | 6957201 |
VIRIN: | 211105-A-UG834-883 |
Resolution: | 4032x3024 |
Size: | 1.82 MB |
Location: | FORT BRAGG, NORTH CAROLINA, US |
Web Views: | 138 |
Downloads: | 2 |
This work, STORM Project Office fields HIMARS launchers to first 3x9 Field Artillery Battalion [Image 2 of 2], by Darrell Ames, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.