M1 Abrams hulls preparing to be inducted into the upgrade process.
Date Taken: | 11.24.2021 |
Date Posted: | 11.30.2021 17:00 |
Photo ID: | 6958468 |
VIRIN: | 211124-D-TH175-412 |
Resolution: | 5184x3456 |
Size: | 6.98 MB |
Location: | LIMA, OHIO, US |
Web Views: | 472 |
Downloads: | 23 |
This work, Joint Systems Manufacturing Center-Lima [Image 9 of 9], by Brian Hahn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.