A Deep Drilling Method rig is seen in operation on the Marysville Ring Levee. Standing at more than 100 feet tall, the rig is used to drill and mix extremely deep seepage cutoff walls that prevent water from seeping under the levee during periods of high water and levee saturation. The work pictured here is taking place on Phase 3, Segment C, and is 90 percent complete. This phase of levee work is expected to wrap up in 2022.