Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Water Sample Shipment at JBPHH [Image 7 of 18]

    Water Sample Shipment at JBPHH

    JOINT BASE PEARL HARBOR-HICKAM (Feb. 8, 2022) Dakota Polivka, a Naval Facilities Engineering Systems Command contractor, prepares water samples for shipment in support of Joint Base Pearl Harbor-Hickam’s (JBPHH) water restoration efforts. The Interagency Drinking Water System Team is a joint initiative where the U.S. Navy is working closely with the Hawaii Department of Health, U.S. Environmental Protection Agency and the U.S. Army to restore safe drinking water to Joint Base Pearl Harbor-Hickam housing communities through sampling and flushing, and the recovery of the Red Hill Well. For detailed information, go to: www.navy.mil/jointbasewater. (U.S. Navy photo by Mass Communication Specialist 2nd Class Mar’Queon A. D. Tramble)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.08.2022
    Date Posted: 02.10.2022 16:02
    Photo ID: 7047032
    VIRIN: 220208-N-TO792-1010
    Resolution: 4101x2734
    Size: 4.35 MB
    Location: US

    Web Views: 56
    Downloads: 5

    PUBLIC DOMAIN