The Army’s GE T901 First Engine to Test installed in the test cell prior to initial engine light off. The engine’s light off marks the start of 100 hours of run time throughout the next two months to verify and validate engine performance models. Photo courtesy of General Electric.
Date Taken: | 03.22.2022 |
Date Posted: | 03.23.2022 11:08 |
Photo ID: | 7104306 |
VIRIN: | 220322-A-TT669-001 |
Resolution: | 2000x1500 |
Size: | 1.08 MB |
Location: | LYNN, MASSACHUSETTS, US |
Web Views: | 249 |
Downloads: | 15 |
This work, FETT installed and ready to test [Image 2 of 2], by David Hylton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.