A contractor carries a ladder towards a construction site at Tyndall Air Force Base, Florida,
March 2, 2022. Once completed, the renovated facility is planned to house the 325th
Operations Support Squadron and will facilitate support for the F-35A Lightning II mission set.
(U.S. Air Force photo by 2nd Lt. Joe Harclerode)
Date Taken: | 03.02.2022 |
Date Posted: | 03.28.2022 15:53 |
Photo ID: | 7112434 |
VIRIN: | 220302-F-FB618-1013 |
Resolution: | 6192x4128 |
Size: | 8.83 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 9 |
Downloads: | 5 |
This work, F-35 Program Integration Office [Image 3 of 3], by 1st Lt. Joseph Hark, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.