Brian Turner, U.S. Army Corps of Engineers, Gull Lake Dam and Recreation Area site manager, adjusts the dam gates at Gull Lake Dam, near Brainerd, Minnesota, Dec. 21, 2021.
Date Taken: | 12.21.2021 |
Date Posted: | 04.01.2022 16:48 |
Photo ID: | 7121368 |
VIRIN: | 211221-A-LI073-045 |
Resolution: | 640x426 |
Size: | 60.05 KB |
Location: | BRAINERD, MINNESOTA, US |
Web Views: | 24 |
Downloads: | 2 |
This work, Mississippi River Headwaters reservoir drawdowns nearly complete [Image 2 of 2], by Patrick Moes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.