220411-N-OT701-10251 WAIANAE, Hawaii (April 11, 2022) Naval Sea Systems Command (NAVSEA) contractors pour concrete during the final phase of an equipment removal project at Nanakuli Beach Park. The final phase of the three-phase project focuses on removing a 20-inch conduit and the top portions of three manhole/vaults, then laying colored cement over the remaining conduit trench and matching the natural rock color and surface height. (U.S. Navy photo by Mass Communication Specialist 2nd Class Greg Hall)
Date Taken: | 04.11.2022 |
Date Posted: | 04.12.2022 22:40 |
Photo ID: | 7140272 |
VIRIN: | 220411-N-OT701-1251 |
Resolution: | 3726x5587 |
Size: | 1.65 MB |
Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
Web Views: | 41 |
Downloads: | 2 |
This work, NAVSEA Equipment Removal Project Off Nanakuli Beach [Image 14 of 14], by ENS Greg Hall, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.