A worker moves logs and other debris with a front-end loader March 3, 2022, along Ditch 2A on the cantonment area at Fort McCoy, Wis. Fort McCoy's Directorate of Public Works coordinated work on the ditch to return the area to standards originally designed when the cantonment area was built in 1942. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 03.03.2022 |
Date Posted: | 04.28.2022 17:40 |
Photo ID: | 7147428 |
VIRIN: | 220303-A-OK556-1741 |
Resolution: | 2983x1915 |
Size: | 1.24 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 1 |
Downloads: | 3 |
This work, Fort McCoy’s DPW coordinates ditch improvement project [Image 17 of 17], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.