U.S. AIR FORCE ACADEMY, Colo. – A worker inspects the Cadet Chapel as repair and restoration work continues on April 5, 2022 at the U.S. Air Force Academy in Colorado Springs, Colo. The chapel closed in early September 2019 and an external 150-foot tall white environmental shelter built to allow for necessary repairs and restoration year-round. (U.S. Air Force photo/Trevor Cokley)
Date Taken: | 04.05.2022 |
Date Posted: | 04.18.2022 19:12 |
Photo ID: | 7147903 |
VIRIN: | 220405-F-XS730-1028 |
Resolution: | 6016x4016 |
Size: | 4.76 MB |
Location: | COLORADO SPRINGS, COLORADO, US |
Web Views: | 12 |
Downloads: | 3 |
This work, USAFA Cadet Chapel Renovation 2022 [Image 24 of 24], by Trevor Cokley, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.