Water flows over the fixed-crest dam at C.W. Bill Young Lock & Dam operated by the U.S. Army Corps of Engineers Pittsburgh District on the Allegheny River in New Kensington, Pennsylvania, April 13, 2022. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)
Date Taken: | 04.13.2022 |
Date Posted: | 04.20.2022 13:37 |
Photo ID: | 7150561 |
VIRIN: | 220413-A-TI382-0011 |
Resolution: | 6016x4016 |
Size: | 2.49 MB |
Location: | PITTSBURGH, PENNSYLVANIA, US |
Web Views: | 14 |
Downloads: | 3 |
This work, Pittsburgh District employees replace hydraulic lines, saving $150K in repair costs [Image 19 of 19], by Michel Sauret, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.