U.S. Marines with Marine Operational Test and Evaluation Squadron (VMX) 1 drop off a Light Armored Vehicle 25 with a CH-53K King Stallion helicopter at Marine Corps Base Camp Lejeune, North Carolina, April 27, 2022. The CH-53K King Stallion, the Marine Corps’ newest heavy-lift helicopter, can lift up to 36,000 pounds of equipment, holds up to 30 troops, and features a computerized fly-by-wire system for semiautonomous piloting. (U.S. Marine Corps photo by Lance Cpl. Elias E. Pimentel III)
Date Taken: | 04.26.2022 |
Date Posted: | 04.28.2022 08:58 |
Photo ID: | 7163918 |
VIRIN: | 220427-M-IC059-1533 |
Resolution: | 5652x3768 |
Size: | 11.27 MB |
Location: | MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA, US |
Web Views: | 145 |
Downloads: | 22 |
This work, CH-53K King Stallion easily lifts armored vehicle [Image 12 of 12], by LCpl Elias Pimentel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.