1st Expeditionary Civil Engineer Group Airmen place burlap on top of finished concrete during a runway overrun repair project at an undisclosed location in Southwest Asia, April 14, 2022. Damp burlap cloth is placed on freshly poured concrete and is continuously hosed down to ensure the concrete is hydrated during the curing process. (U.S. Air Force photo by Master Sgt. Christopher Parr)
Date Taken: | 04.14.2022 |
Date Posted: | 05.03.2022 07:58 |
Photo ID: | 7168475 |
VIRIN: | 220414-F-IB640-1459 |
Resolution: | 3169x2111 |
Size: | 3.92 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 32 |
Downloads: | 10 |
This work, Civil engineers improve runway operations for Red Tails [Image 10 of 10], by Christopher Parr, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.