Sgt. First Class Kenneth Morton, a power production specialist with the U.S. Army Corps of Engineers 249th Engineer Battalion Delta Company, gathers electrical panel information on a building at Carlisle Barracks in Carlisle, Pa. on April 28, 2022. Soldiers are gathering electrical load data from multiple buildings on post as part of a critical infrastructure analysis for FEMA to see what it would take to power up various pieces of infrastructure during an emergency response situation. (U.S. Army photo/Patrick Bloodgood)
Date Taken: | 04.28.2022 |
Date Posted: | 05.05.2022 11:52 |
Photo ID: | 7176445 |
VIRIN: | 220428-A-OI229-372 |
Resolution: | 5472x3648 |
Size: | 0 B |
Location: | CARLISLE, PENNSYLVANIA, US |
Web Views: | 41 |
Downloads: | 4 |
This work, Electrical Infrastructure Analysis [Image 13 of 13], by Patrick Bloodgood, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.