Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Isabella Dam Construction Progress April 2022 [Image 9 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Isabella Dam Construction Progress April 2022

    LAKE ISABELLA, CALIFORNIA, UNITED STATES

    04.28.2022

    Photo by Jeremy Croft 

    U.S. Army Corps of Engineers, Sacramento District

    Victor Ozuna, left, and Floyd Bolton, right, resident engineers with the U.S. Army Corps of Engineers Sacramento District, point out features of the Auxiliary Dam at the Isabella Dam Safety Modification Project to Taylor Levesque, a reporter with 23ABC News Bakersfield, in Lake Isabella, California, April 28, 2022. Crews have been raising the height of both the Main and Auxiliary Dams by 16 feet to reduce flood risk to downstream communities, including Bakersfield. Phase Two of the project is expected to be completed later this year.

    IMAGE INFO

    Date Taken: 04.28.2022
    Date Posted: 05.09.2022 18:09
    Photo ID: 7184005
    VIRIN: 220428-A-XI267-158
    Resolution: 5568x3712
    Size: 13.44 MB
    Location: LAKE ISABELLA, CALIFORNIA, US

    Web Views: 118
    Downloads: 6

    PUBLIC DOMAIN