Removal of a water diversion structure used to hold the river back from excavation work along the bank.
Date Taken: | 05.11.2022 |
Date Posted: | 05.11.2022 16:35 |
Photo ID: | 7190767 |
VIRIN: | 220511-D-RQ622-690 |
Resolution: | 1280x960 |
Size: | 323.98 KB |
Location: | US |
Web Views: | 5 |
Downloads: | 3 |
This work, Naval Facilities Engineering and Expeditionary Warfare Center [Image 5 of 5], by Palmer Pinckney II, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.