Airmen assigned to the 171st Air Refueling Wing, Pennsylvania Air National Guard, walk the nearly two-mile length of Pittsburgh International Airport’s runway 10 right-28 left in search of foreign objects and debris May 23, 2022. Runway 10 right-28 left has been closed since January 2022 for repairs. Prior to opening the runway, it needs to be clear of small rocks and other debris for safety. The runways close proximity to the 171st allows the units KC-135 Aircraft to take off without delay caused by taxiing. (U.S. Air National Guard photo by Tech. Sgt. Bryan Hoover)
Date Taken: | 05.23.2022 |
Date Posted: | 05.26.2022 14:59 |
Photo ID: | 7240670 |
VIRIN: | 220523-Z-EY983-1003 |
Resolution: | 6048x4024 |
Size: | 8.21 MB |
Location: | CORAOPOLIS, PENNSYLVANIA, US |
Web Views: | 33 |
Downloads: | 4 |
This work, Last Steps: Airmen Check Runway for Debris prior to Reopening [Image 3 of 3], by MSgt Bryan Hoover, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.