Rob Hale, left, Parth Kathrotiya, center, and Zack Russo of AEDC Hypervelocity Wind Tunnel 9 in White Oak, Maryland, pose in 2019 with the Mach 18 nozzle. Calibration of the Mach 18 system was completed at Tunnel 9 in July 2020. The system checked out, allowing Tunnel 9 to begin offering Mach 18 testing to customers. The first customer runs at Mach 18 occurred in August 2020. The expansion to Mach 18 is among a number of accomplishments and milestones that have occurred at Tunnel 9. On April 11, the Tunnel 9 test crew executed the 5,000th run at the facility. (U.S. Air Force photo by A.J. Spicer) (This image has been altered by obscuring badges for security purposes.)
Date Taken: | 03.22.2019 |
Date Posted: | 05.31.2022 10:50 |
Photo ID: | 7242233 |
VIRIN: | 190322-F-GB367-0001 |
Resolution: | 6000x4000 |
Size: | 2.15 MB |
Location: | WHITE OAK, MARYLAND, US |
Web Views: | 85 |
Downloads: | 3 |
This work, AEDC Hypervelocity Wind Tunnel 9 reaches 5,000 run mark [Image 3 of 3], by Addison J Spicer, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.