Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Building a force of multi-capable Airmen [Image 12 of 16]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Building a force of multi-capable Airmen

    TYNDALL AIR FORCE BASE, FLORIDA, UNITED STATES

    05.20.2022

    Photo by Airman 1st Class Tiffany Del Oso 

    325th Fighter Wing

    U.S. Air Force Staff Sgt. Blaine Redman, 801st Rapid Engineer Deployable Heavy Operational Repair Squadron Engineer Training Squadron power production contingency instructor, takes cover behind a building during a Shoot-Move-Communicate exercise during the 325th Fighter Wing Augmentation Program at Tyndall Air Force Base, Florida, May 20, 2022. The 325th Security Forces Squadron has trained more than 43 Airmen across Tyndall as SF augmentees to aid in manpower during the installation’s rebuild. Augmentees are given a foundational understanding of SF throughout a five-day course to include combative and use-of-force training so that when needed, they can post alongside defenders and contribute to the SF mission of integrated installation defense. (U.S. Air Force photo by Airman 1st Class Tiffany Del Oso)

    IMAGE INFO

    Date Taken: 05.20.2022
    Date Posted: 05.31.2022 14:11
    Photo ID: 7246336
    VIRIN: 220520-F-DB615-1378
    Resolution: 6048x4024
    Size: 1.68 MB
    Location: TYNDALL AIR FORCE BASE, FLORIDA, US

    Web Views: 12
    Downloads: 5

    PUBLIC DOMAIN