An excavator operator uses an excavator to dig out a ditch May 26, 2022, on the cantonment area at Fort McCoy, Wis. The operator is with the Fort McCoy grounds contractor. The work was completed in coordination with the Fort McCoy Directorate of Public Works. During spring and summer annually at Fort McCoy, this kind of work is often done to improve infrastructure operations. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 05.26.2022 |
Date Posted: | 06.03.2022 12:26 |
Photo ID: | 7248153 |
VIRIN: | 220526-A-OK556-473 |
Resolution: | 4032x2268 |
Size: | 1.6 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 5 |
Downloads: | 3 |
This work, Ditch improvement work at Fort McCoy [Image 19 of 19], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.