Contractors test voltage using “hot sticks” atop a lift at substation N on Vandenberg Space Force Base, Calif., June 2, 2022. Power is routed to the substation using a phasing system, and to make sure the phases are in sync, voltage has to be measured using hot sticks. (U.S. Space Force photo by Airman 1st Class Ryan Quijas)
Date Taken: | 06.02.2022 |
Date Posted: | 06.21.2022 12:57 |
Photo ID: | 7281589 |
VIRIN: | 220602-F-HB409-1075 |
Resolution: | 6840x5504 |
Size: | 20.19 MB |
Location: | VANDENBERG SPACE FORCE BASE, CALIFORNIA, US |
Web Views: | 111 |
Downloads: | 7 |
This work, Vandenberg’s South Base Re-energizes with the Activation of Substation N [Image 5 of 5], by SrA Ryan Quijas, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.