Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Barracks construction on second barracks continues at Fort McCoy [Image 30 of 33]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Barracks construction on second barracks continues at Fort McCoy

    Construction work is shown July 22, 2022, in the 1600 block of the cantonment area at Fort McCoy, Wis., on a second new transient training troops barracks project on the post. The $18.8 million project was awarded to L.S. Black Constructors, which is the contractor who built the first barracks building at Fort McCoy, according to the U.S. Army Corps of Engineers Resident Office at Fort McCoy. The new contract was awarded Sept. 29, 2020, and the notice to proceed was issued Oct. 28, 2020. The contract duration is scheduled for completion in 780 calendar days. Currently contract completion is scheduled for December 2022. The barracks is different than the traditional barracks located throughout the installation. This new building will be four stories and able to house 400 people in approximately 60,000 square feet. The building is being built with the latest in construction materials and include state-of-the-art physical security and energy-saving measures. The project also is part of the Fort McCoy Master Plan that looks at continuously upgrading the installation’s infrastructure to be prepared for the future. The Army Corps of Engineers is managing the project. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    IMAGE INFO

    Date Taken: 07.22.2022
    Date Posted: 07.29.2022 14:55
    Photo ID: 7343384
    VIRIN: 220722-A-OK556-5384
    Resolution: 4287x2712
    Size: 1.95 MB
    Location: FORT MCCOY, WISCONSIN, US

    Web Views: 6
    Downloads: 4

    PUBLIC DOMAIN