Soils falls from the hydraulic drill as contractors use a piling rig to assemble continuous flight auger piles in place for the foundations of a water reservoir, on Chièvres Air Base, Belgium, July 01, 2022. (U.S. Army photo by Pierre-Etienne Courtejoie)
Date Taken: | 07.01.2022 |
Date Posted: | 08.02.2022 10:12 |
Photo ID: | 7348634 |
VIRIN: | 220701-A-BD610-0006 |
Resolution: | 8256x4640 |
Size: | 9.75 MB |
Location: | CHIèVRES AIR BASE, HAINAUT (WAL), BE |
Web Views: | 8 |
Downloads: | 3 |
This work, Water Infrastructure Upgrades: Foundations of Water Reservoir [Image 14 of 14], by Pierre Courtejoie, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.