U.S. Army Corps technicians work to repair the upstream navigation lock at John Day Lock and Dam while keeping the lock operational, August 3, 2022.
Date Taken: | 08.03.2022 |
Date Posted: | 08.05.2022 16:19 |
Photo ID: | 7355257 |
VIRIN: | 220803-A-AI699-632 |
Resolution: | 3456x5184 |
Size: | 15.19 MB |
Location: | OREGON, US |
Web Views: | 24 |
Downloads: | 2 |
This work, Crew work quickly to repair the upstream navigation lock gate at John Day Lock and Dam, with Portland District, U.S. Army Corps of Engineers, Aug 3. [Image 4 of 4], by Benjamin Rogers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.