Binh Nguyen, left, John Daniels, center, and Madison Holiday, right, Warner Robins Business Office workload analysts, stand beside the first HC-130J Super Hercules aircraft to receive an intensive D-Check at Robins Air Force Base, Georgia, Aug. 12, 2022. The D-Check is an extensive process equivalent to program depot maintenance, but with more inspections. It takes approximately 150 technicians 233 days to complete. (U.S. Air Force photo by Rodney Speed)
Date Taken: | 08.12.2022 |
Date Posted: | 08.17.2022 10:18 |
Photo ID: | 7374100 |
VIRIN: | 220812-F-DO607-7899 |
Resolution: | 6192x4128 |
Size: | 1.13 MB |
Location: | ROBINS AIR FORCE BASE, GEORGIA, US |
Web Views: | 38 |
Downloads: | 2 |
This work, WR-ALC completes first HC-130J aircraft D-Check for AFSOC [Image 3 of 3], by Rodney Speed, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.