Crewmembers with the U.S. Army Corps of Engineers Medium Capacity Fleet performs repairs at the New Cumberland Locks and Dam on the Ohio River in Moraine, Ohio, Aug. 10, 2022. The fleet has been working to replace the upstream and downstream miter gates of the auxiliary lock, with repairs projected to complete by 2024. The Medium Capacity Fleet is headquartered in Pittsburgh but operated by the Huntington District to perform maintenance and repair projects on the rivers for waterway navigation. The New Cumberland facility is operated by the U.S. Army Corps of Engineers Pittsburgh District. (U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret)
Date Taken: | 08.10.2022 |
Date Posted: | 08.17.2022 15:06 |
Photo ID: | 7374853 |
VIRIN: | 220810-A-TI382-0906 |
Resolution: | 5472x3648 |
Size: | 2.26 MB |
Location: | MORAINE, OHIO, US |
Web Views: | 7 |
Downloads: | 3 |
This work, Gate keepers: Installing new miter gates at New Cumberland requires planning, time, extra measures [Image 22 of 22], by Michel Sauret, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.