“We are about halfway through a two-year sprint to improve rate of fire for the ERCA system,” said Cpt. Mark Toups of the Army’s Long Range Precision Fire's Cross Functional Team.
Date Taken: | 07.25.2022 |
Date Posted: | 08.29.2022 12:36 |
Photo ID: | 7376173 |
VIRIN: | 220725-D-HP227-265 |
Resolution: | 4048x2696 |
Size: | 5.86 MB |
Location: | YUMA PROVING GROUND, ARIZONA, US |
Web Views: | 39 |
Downloads: | 5 |
This work, ERCA’s rate of fire increase under development at YPG [Image 3 of 3], by Brandon Mejia, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.