Multiple drill rigs work on creating drilled piers for the foundation of the North Parking Garage of the Louisville VA Medical Center, in Louisville, Kentucky Sept. 2, 2022. Construction of the facility is anticipated to be completed in 2026.
Date Taken: | 09.02.2022 |
Date Posted: | 09.12.2022 14:54 |
Photo ID: | 7412397 |
VIRIN: | 220902-A-GI410-646 |
Resolution: | 3000x2000 |
Size: | 1.12 MB |
Location: | LOUISVILLE/JEFFERSON COUNTY METRO GOVERNMENT (BALANCE), KENTUCKY, US |
Web Views: | 76 |
Downloads: | 4 |
This work, Major features of Louisville VA Medical Center project lay down foundations for future work [Image 4 of 4], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.