An F-16 Fighting Falcon aircraft, assigned to Spangdahlem Air Base, Germany, runs through a test of the Barrier Arresting Kit-12 at Ramstein Air Base, Germany, Sept. 29, 2022. The BAK-12 decelerates the aircraft on the runway, ensuring the pilot and aircraft lands safely if they are unable to. (U.S. Air Force photo by Airman 1st Class Jordan Lazaro )
Date Taken: | 09.29.2022 |
Date Posted: | 09.30.2022 13:58 |
Photo ID: | 7443704 |
VIRIN: | 220929-F-XE065-0026 |
Resolution: | 4919x2930 |
Size: | 1.61 MB |
Location: | RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE |
Web Views: | 92 |
Downloads: | 18 |
This work, 786 CES Airmen overhaul old BAK-12 [Image 9 of 9], by SrA Jordan Lazaro, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.