U.S. Air Force Staff Sgt. Ryan Morris, 386th Expeditionary Civil Engineer Squadron water, fuels and systems maintenance technician, uses a shovel to take out a piece of the flightline during a flightline repair at an undisclosed location, August 5, 2022. The 386th ECES were able to successfully repair two upheavals on the flightline enabling coalition partners and future operations to operate the flightline with mitigated risk. (U.S. Air Force photo by Staff Sgt. Dalton Williams)
Date Taken: | 08.04.2022 |
Date Posted: | 10.03.2022 08:06 |
Photo ID: | 7446434 |
VIRIN: | 220804-F-DJ189-1003 |
Resolution: | 5081x3380 |
Size: | 3.52 MB |
Location: | (UNDISCLOSED LOCATION) |
Web Views: | 10 |
Downloads: | 2 |
This work, 386th ECES lay foundation for Agile Combat Employment capabilities [Image 12 of 12], by SSgt Dalton Williams, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.