U.S. Air Force Airmen with the 62d Airlift Wing step onto a C-17 Globemaster III prior to departing for a deployment from Joint Base Lewis-McChord, Washington, Sept. 26, 2022. This deployment is Team McChord’s first implementation of the Mobility Air Force Force Generation deployment model. (U.S. Air Force photo by Airman 1st Class Colleen Anthony)
Date Taken: | 09.26.2022 |
Date Posted: | 10.06.2022 17:15 |
Photo ID: | 7453761 |
VIRIN: | 220926-F-TT585-1082 |
Resolution: | 6048x4024 |
Size: | 1.92 MB |
Location: | JOINT BASE LEWIS-MCCHORD, WASHINGTON, US |
Web Views: | 31 |
Downloads: | 5 |
This work, First McChord deployment with new MAFFORGEN model [Image 8 of 8], by SrA Colleen Anthony, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.