Water resource specialist Milan Mora updates Brig. Gen. Daniel Hibner on the beach erosion control project at Long Key Island, Florida post Hurricane Ian. 250,000 cubic yards of sand are added to this area every 5 years to prevent erosion and lessen the impact of hurricane damage to the area.
Date Taken: | 10.07.2022 |
Date Posted: | 10.17.2022 11:10 |
Photo ID: | 7463654 |
VIRIN: | 221007-O-A1411-912 |
Resolution: | 1107x830 |
Size: | 345.55 KB |
Location: | LONG KEY ISLAND, FLORIDA, US |
Web Views: | 10 |
Downloads: | 8 |
This work, Hibner visits beach erosion control project after Hurricane Ian [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.