Drilling for secant pile installation on Berth 11 as part of OICC Portsmouth Naval Shipyard’s Multi-Mission Dry Dock #1, P381.
Date Taken: | 09.14.2022 |
Date Posted: | 11.16.2022 16:58 |
Photo ID: | 7516466 |
VIRIN: | 220914-O-DT551-851 |
Resolution: | 2448x3264 |
Size: | 1.55 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 174 |
Downloads: | 9 |
This work, OICC Portsmouth Naval Shipyard Multi-Mission Dry Dock #1 [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.