Here basement walls and utility installation continue to be installed in the basement of the facilities’ West Bar Nov. 21.
Date Taken: | 11.21.2022 |
Date Posted: | 12.12.2022 10:28 |
Photo ID: | 7552436 |
VIRIN: | 221121-A-GI410-1061 |
Resolution: | 2916x2000 |
Size: | 2.76 MB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 14 |
Downloads: | 4 |
This work, Louisville VA Medical Center project wraps up first year of construction [Image 5 of 5], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.