A groundbreaking ceremony was held for the Joint Air Defense Operations Center (JADOC) phase two construction project at Joint Base Anacostia-Bolling December 12.
A $21,734,000 firm-fixed-price construction contract was awarded to Grunley Construction Company Inc., Rockville, Md., by Naval Facilities Engineering Systems Command Washington September 28. The work to be performed provides for construction services to complete the JADOC permanent facility.
JADOC's command and control centers operate 24 hours a day, seven days a week, relaying information about airspace and air defense around the National Capital Region. Established following 9/11, JADOC initially operated from multiple temporary locations. With this new facility, JADOC has consolidated functions into a permanent home and operates with state-of-the-art technologies.
(Front row left to right) Col. Brian Lehew, Col. Paul Bishop, Col. Catherine Logan, Brig. Gen. Richard Wholey, Maj. Gen. S.T. Boyle, Col. Ken Ratliff, and Lt. Col. Joshua Jessup (at podium) Maj. Claude Hibbert
Date Taken: | 12.12.2022 |
Date Posted: | 12.13.2022 12:03 |
Photo ID: | 7554476 |
VIRIN: | 221213-N-HG124-1004 |
Resolution: | 3169x2112 |
Size: | 1.06 MB |
Location: | DISTRICT OF COLUMBIA, US |
Web Views: | 66 |
Downloads: | 3 |
This work, Joint Air Defense Operations Center (JADOC) Phase Two Groundbreaking Ceremony [Image 3 of 3], by Matthew Stinson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.