The USACE Buffalo District conducts work in Painesville, Ohio with contracting partners, Nerone & Sons, Inc, to stabilize the steep bank between Bank Street and the Grand River to protect critical public infrastructure, including roadway and utilities, and the Grand River from further erosion at this location, December 13, 2022. (U.S. Army Photo by Andre' M. Hampton)
Date Taken: | 12.13.2022 |
Date Posted: | 12.13.2022 18:29 |
Photo ID: | 7555570 |
VIRIN: | 221213-A-VR700-008 |
Resolution: | 1080x1080 |
Size: | 619.08 KB |
Location: | PAINESVILLE, OHIO, US |
Web Views: | 6 |
Downloads: | 4 |
This work, USACE Buffalo District Bank Street Stabilization Project [Image 5 of 5], by Andre Hampton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.