ROBINS AIR FORCE BASE, Ga. – Ivey Phillips, 562nd Aircraft Maintenance Squadron aircraft mechanic, fills a grease fitting on a C-17 aircraft actuator during the build up gate at Robins Air Force Base, Georgia, Dec. 8, 2022. The Planned/Scheduled Depot Level Maintenance processes can be done in as little as 12 days but could also take over six months, depending on the customer’s requests and aircraft’s condition. (U.S. Air Force photo by Joseph Mather)
Date Taken: | 12.08.2022 |
Date Posted: | 12.14.2022 09:42 |
Photo ID: | 7556469 |
VIRIN: | 221208-F-ED303-0028 |
Resolution: | 4128x6192 |
Size: | 1.9 MB |
Location: | ROBINS AIR FORCE BASE, GEORGIA, US |
Web Views: | 32 |
Downloads: | 3 |
This work, WR-ALC: Providing quality C-17 Globemaster aircraft maintenance to the warfighter [Image 5 of 5], by Joseph Mather, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.