Kittery, ME (December 13, 2022) – After sunset work in Brewer, ME in support of OICC Portsmouth Naval Shipyard’s Multi-Mission Dry Dock project, P381. This work is part of the Shipyard Infrastructure Optimization Program to update the physical layout of the nation’s four public Naval Shipyards, upgrade and modernize their dry docks, and replace antiquated capital equipment with modern tools and technologies and will double the shipyard’s capacity for performing Virginia Class submarine maintenance. (Photo courtesy of Matthew Gill)
Date Taken: | 12.13.2022 |
Date Posted: | 12.16.2022 16:27 |
Photo ID: | 7560964 |
VIRIN: | 221213-O-DT551-227 |
Resolution: | 4032x3024 |
Size: | 4.12 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 326 |
Downloads: | 9 |
This work, Pre-Cast Monolith Construction Progresses in Brewer, ME. Officer in Charge of Construction Portsmouth Naval Shipyard [Image 2 of 2], by Victoria Arel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.