Work takes place in the dewatered 1,200-foot lock chamber at Cannelton Locks and Dam in Cannelton, Indiana, Sept. 20, 2022
Date Taken: | 09.20.2022 |
Date Posted: | 12.19.2022 13:28 |
Photo ID: | 7563043 |
VIRIN: | 220920-A-KX407-002 |
Resolution: | 1534x2048 |
Size: | 460.81 KB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 18 |
Downloads: | 3 |
This work, Cannelton’s primary lock chamber reopens after dual miter gate replacement [Image 3 of 3], by Abby Korfhage, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.