Railcars that were loaded by Soldiers with the Army Reserve’s 411th Engineer Company with military vehicles and equipment are shown Nov. 14, 2022, at Fort McCoy, Wis. Overall the company loaded 128 items on to railcars over the multi-day rail movement at the installation to deploy the equipment eventually to the U.S. Central Command area of responsibility. Five personnel with the Fort McCoy Logistics Readiness Center (LRC) assisted with the rail movement and its coordination. The 411th is the latest of many units over the last decade to hold rail movements at Fort McCoy. As a matter of fact, for the many decades of Fort McCoy’s existence, the capability to transport cargo and equipment to and from the installation by rail has always been there. And it’s a capability that will continue, Fort McCoy LRC officials said. During World War II, for example, the railroad at Fort McCoy was one of the main forms of transportation for bringing troops in for training and home after the war as well as for moving cargo and equipment in and out of the installation. The 411th is headquartered in Cedar Rapids, Iowa. (U.S. Army Photo by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 11.14.2022 |
Date Posted: | 12.21.2022 16:32 |
Photo ID: | 7567872 |
VIRIN: | 221114-A-OK556-4154 |
Resolution: | 3274x2182 |
Size: | 1.39 MB |
Location: | FORT MCCOY, WISCONSIN, US |
Web Views: | 16 |
Downloads: | 6 |
This work, Fort McCoy railroad ops picks up steam in 2022 with spring, summer, fall rail movements [Image 40 of 40], by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.