100kW TQG Generator set with operation panel in the open position.
Date Taken: | 12.19.2022 |
Date Posted: | 01.12.2023 12:05 |
Photo ID: | 7586880 |
VIRIN: | 221219-A-CR319-673 |
Resolution: | 4000x3000 |
Size: | 3.16 MB |
Location: | IQ |
Web Views: | 164 |
Downloads: | 3 |
This work, The Power Team: What the Hospital Runs On [Image 3 of 3], by CPT Brandon Janson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.